Temporary buried scaffolding - List of Manufacturers, Suppliers, Companies and Products | IPROS

Temporary buried scaffolding Product List

1~3 item / All 3 items

Displayed results

Striped steel plate footboard "Lightweight Corner Step"

25% lighter compared to conventional products! Compatible with framework, next-generation, and single-pole scaffolding.

The "Lightweight Corner Step" is a steel plate scaffold board that forms a nearly flat working surface used in the gaps of corners. By reducing the plate thickness to 2.3mm, we have achieved approximately 25% weight reduction. It features specially shaped rib processing, allowing for a load capacity equivalent to conventional products. Designed according to our unique standards and the Industrial Safety and Health Act, it ensures that the gap during installation is less than 30mm. 【Features】 ■ Improved gripping hardware allows for use with Φ48.6 and Φ42.7 single pipes ■ Reduced plate thickness to 2.3mm, achieving approximately 25% weight reduction ■ The special rib shape maintains load capacity equivalent to conventional products ■ Usable within a range of approximately 80 to 400mm from the center of the horizontal member (single pipe) *For more details, please download the PDF or feel free to contact us.

  • Scaffolding and Support Materials
  • Temporary buried scaffolding

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lightweight Corner Step for Construction Sites - Sales, Gap Filling, Temporary Scaffolding

25% lighter compared to conventional products! Compatible with framework, next-generation, and single-pole scaffolding.

The "Lightweight Corner Step" is a nearly flat working platform made of corrugated steel plates, designed for use in the gaps of corners. By reducing the plate thickness to 2.3mm, we have achieved approximately 25% weight reduction. It features specially shaped rib processing, allowing for a load capacity equivalent to conventional products. In accordance with our unique standards and the Industrial Safety and Health Act, it is designed to ensure a gap of 30mm or less during installation. 【Features】 ■ Improved gripping hardware allows for use with Φ48.6 and Φ42.7 single pipes ■ Plate thickness reduced to 2.3mm, achieving approximately 25% weight reduction ■ Load capacity equivalent to conventional products due to specially shaped rib processing ■ Usable within a range of approximately 80 to 400mm from the center of the horizontal member (single pipe) *For more details, please download the PDF or feel free to contact us.

  • Scaffolding and Support Materials
  • Temporary buried scaffolding

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lightweight corner step for shipbuilding sales, gap filling, temporary scaffolding.

25% lighter compared to conventional products! Compatible with framework, next-generation, and single-pole scaffolding.

In the shipbuilding industry, ensuring the safety of workers and securing an efficient workspace during the assembly and repair of hulls is essential. The "Lightweight Corner Step" is a scaffold board made of checker plate steel that forms a nearly flat working floor used in corner gaps. By reducing the plate thickness to 2.3mm, we have achieved approximately 25% weight reduction. It features specially shaped rib processing, allowing for a load capacity equivalent to conventional products. In accordance with our unique standards and safety regulations, it is designed to maintain a gap of 30mm or less during installation. 【Features】 ■ Improved gripping hardware allows for use with Φ48.6 and Φ42.7 single pipes ■ Reduced plate thickness to 2.3mm, achieving approximately 25% weight reduction ■ Load capacity is equivalent to conventional products due to specially shaped rib processing ■ Usable within a range of approximately 80 to 400mm from the center of the horizontal member (single pipe) *For more details, please download the PDF or feel free to contact us.

  • Scaffolding and Support Materials
  • Temporary buried scaffolding

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Temporary buried scaffolding